How to specify reactive power compensation for an onshore wind farm, step by step

Single-line diagram of an onshore wind farm with its reactive power compensation in Electrisim

A wind farm has to deliver and absorb a set amount of reactive power at its point of connection. The turbines provide most of it. Whether they provide enough, at every active power and every grid voltage, depends on what the cables and transformers between the turbines and the grid add and take away. Compensation equipment fills the gap. This guide goes through the sizing in six steps, with the 33 MW onshore wind farm that is one of the diagram templates in Electrisim: ten turbines, a 30 kV collector network and one transformer to 110 kV.

Step 1: write down the requirement

Take the numbers from the grid code and the connection agreement. A common requirement for a power park module is a reactive power range of 0.33 Q/Pmax in both directions at the point of connection, over a band of grid voltages. For 33 MW that is 10.9 Mvar capacitive and 10.9 Mvar inductive. Many codes also set a limit on the reactive power exchanged when the plant is at standstill.

Step 2: know what the network adds and takes

ElementEffectRule of thumb
CablesGenerate reactive power all the time, whatever the windQ = U2·ω·C: about 70 kvar per km at 30 kV, about 0.6 Mvar per km at 110 kV
TransformersAbsorb reactive power, growing with the square of the loadingQ ≈ uk·S2/Sn: a 40 MVA unit with 12 % carrying 35 MVA absorbs 3.7 Mvar
TurbinesDeliver or absorb, within their P-Q capabilityLess reactive power is available at full active power and at low terminal voltage

Two corners of the requirement are hard to meet. At full power and low grid voltage the transformers absorb the most and the turbines have the least to give, so the plant runs short on the capacitive side. At low wind or standstill the cables keep generating, so the plant exports reactive power it is not allowed to export, and runs short on the inductive side.

Step 3: find the shortfall with a P-Q study

Run Simulate → Grid Code Compliance (P-Q) without any compensation, at the lowest, the nominal and the highest grid voltage. The chart shows the reactive power the plant can reach at the point of connection in red and the requirement in blue. Where red does not cover blue, the horizontal distance between them is the shortfall in Mvar. Read it at each voltage, on both sides. The grid code compliance guide explains the study in detail.

Step 4: choose the type of equipment

EquipmentCoversConsider
Fixed shunt reactorA constant inductive shortfall, mostly cable chargingIt also absorbs at full power, where the plant needs capacitive reactive power. Check that corner again.
Switched or stepped reactorAn inductive shortfall at low power onlyThe voltage step at switching
Capacitor bankA capacitive shortfall at high powerVoltage step, and resonance with the grid: see the harmonics guide
STATCOMBoth sides, continuously, also at low voltageCost. Often chosen when the code asks for fast voltage control.

Step 5: size it

The rating is the largest shortfall on that side plus a margin for tolerances in cable and transformer data. Remember that a reactor or capacitor delivers its rated Mvar only at rated voltage: at 0.95 p.u. it gives 90 %. A capacitor bank is therefore weakest exactly where it is needed most, and must be sized at the lowest voltage.

For switched equipment, check the voltage step. It is roughly the switched reactive power divided by the short-circuit power at the bus: 5 Mvar on a bus with 500 MVA moves the voltage by 1 %. Grid operators usually limit the step to a few percent, which sets the largest size of one step.

Step 6: put it in the model and verify

  1. Add the shunt reactor, capacitor or STATCOM to the diagram at the bus where it will be installed.
  2. If the plant has one, set up the Park Controller, and a Plant Supervisory Controller to coordinate the turbines with the reactor steps and the STATCOM.
  3. Run the P-Q study again with shunt control switched on, and then Grid Code Compliance (V-Q) for the voltage range at full power.
  4. Use Check overloads in the results: the extra reactive power must not overload a cable or the transformer.
  5. Check the standstill case with the option Q with units not operating.

The plant is specified when red covers blue at every voltage, nothing is overloaded and the standstill exchange is within its limit.

What this method does not cover

The sizing above is a steady-state load-flow result. Fault ride-through, the speed of the voltage control and harmonic emission are separate requirements with their own studies.

The 33 MW wind farm is under New diagram in the app: app.electrisim.com. You can also download the model.

Related: the original step-by-step article on LinkedIn with its case study, the video walkthrough, the power factor correction calculator and the short circuit study on the same wind farm.

Try Electrisim Personal for $10 per month

Run pandapower, OpenDSS & ANDES studies (load flow, short-circuit, OPF, harmonics, dynamics) in your browser — cancel anytime, no setup fees.

Subscribe Secure via Stripe · 1-click cancel