Offshore wind farm model - 1 GW, 100km
We’re excited to present a offshore wind farm model with 1 GW rated power, with 100 km cable route length (between offshore and onshore substation). This model can be used to explore and adapt, thanks to open-source software at https://electrisim.com/ which you can use on a web-browser (no installation needed).
🔍 What’s special about this model?
- Fully customizable: Adjust parameters to suit your needs.
- Comprehensive analysis: Perform load flow and short-circuit calculations.
- Perfect for electrical/power system/T&D engineers or researchers.
💡Technical assumptions
- 15 MW wind turbines
- 2 offshore substations and 2 cable lines
- 66 kV inter-array cable network
- 275 kV cable lines
- 400 kV cable lines
- 400 kV – grid connection point in the Grid
- 66/275 kV offshore substations with two-winding transformers (with on-load tap changer) fixed shunt reactors
- 275/400 kV onshore substation with two-winding transformers (with on-load tap changer) variable shunt reactors, STATCOM and harmonic filters.
Changelog
- 2025-02-21: rev 1 - STATCOM and 400 kV cable added
- 2025-01-31: rev 0 - base model
🎥 See it in action below.
You can download for free or purchase the model. By purchasing it you are supporting the development of the Electrisim open-source software. Your contribution would help ensure that this open-source software remain accessible to everyone, fostering collaboration and progress in the community.