Offshore wind farm model - 1 GW, 100km
We’re excited to present a offshore wind farm model with 1 GW rated power, with 100 km cable route length (between offshore and onshore substation). This model can be used to explore and adapt, thanks to open-source software at https://electrisim.com/ which you can use on a web-browser (no installation needed).
🔍 What’s special about this model?
- Fully customizable: Adjust parameters to suit your needs.
- Comprehensive analysis: Perform load flow and short-circuit calculations.
- Perfect for electrical/power system/T&D engineers or researchers.
💡Technical assumptions
- 15 MW wind turbines
- 2 offshore substations and 2 cable lines
- 66 kV inter-array cable network
- 275 kV cable lines
- 400 kV cable lines
- 400 kV – grid connection point in the Grid
- 66/275 kV offshore substations with two-winding transformers (with on-load tap changer) fixed shunt reactors
- 275/400 kV onshore substation with two-winding transformers (with on-load tap changer) variable shunt reactors, STATCOM and harmonic filters.
Changelog
- 2025-02-21: rev 1 - STATCOM and 400 kV cable added
- 2025-01-31: rev 0 - base model
🎥 See it in action below.
We are here to support you every step of the way. If you have any questions, run into issues, or just need some guidance, don’t hesitate to reach out. We are committed to making sure you have the best experience possible.