Short circuit analysis: IEC 60909, ANSI/IEEE C37 and what the numbers are for
A short circuit study answers one question for every bus of a network: how much current flows if a fault happens here? The answer decides the rating of every breaker, busbar and cable, and it is the input to protection settings and arc flash calculations. This guide explains what the study returns, how the two common standards differ, and how to run it in Electrisim.
What the study gives you, and what each value is for
| Value | Meaning | Used for |
|---|---|---|
| Ik″ | Initial symmetrical short-circuit current (r.m.s.) | The reference value: fault level, protection pickup, arc flash |
| ip | Peak current, the highest instantaneous value with the DC offset | Making capacity of breakers, mechanical strength of busbars |
| Ib | Symmetrical breaking current when the contacts part | Breaking capacity of breakers |
| Ik | Steady-state current after the transients have decayed | Slow protection, generator behaviour |
| Ith | Thermal equivalent current over the fault duration | Short-time withstand of cables, switchgear and transformers |
The IEC 60909 method in four lines
IEC 60909 does not need a load flow. It replaces all sources by one equivalent voltage source at the fault location and divides by the impedance of the network seen from there:
Ik″ = c · Un / (√3 · Zk)
The voltage factor c covers what the method leaves out: the voltage before the fault, tap positions and loads. For the maximum current it is 1.1 at medium and high voltage and 1.05 or 1.1 at low voltage. For the minimum current it is 1.0, or 0.95 at low voltage. The peak follows from the ratio of resistance to reactance at the fault:
ip = κ · √2 · Ik″, κ = 1.02 + 0.98 · e−3R/X
A network with little resistance, close to a large transformer or a generator, has a κ near 1.8 and a slowly decaying DC component. Far out on a cable feeder κ is close to 1.
Maximum and minimum: two studies with two purposes
- Maximum case. The highest current, with the strongest grid, all sources in service and the upper voltage factor. Equipment ratings are checked against it.
- Minimum case. The lowest current, with the weakest grid and the lower voltage factor. Protection must still see it and trip, so settings are checked against it.
The same split applies to fault types. A three-phase fault usually gives the highest current. Close to a transformer with an earthed star point a single-phase fault can exceed it. At the end of a long feeder the single-phase minimum is the value protection has to detect.
A hand check worth knowing
At the terminals of a transformer fed from a strong grid, the fault current is roughly the rated current divided by the short-circuit voltage. For a 1600 kVA, 20/0.4 kV transformer with uk = 6 %:
Ir = 1600 kVA / (√3 · 0.4 kV) = 2309 A, Ik″ ≈ 1.05 · 2309 A / 0.06 = 40.4 kA
The transformer correction factor of the standard raises this by about 4 %, and the impedance of the grid lowers it again. With R/X = 0.2 the peak factor is 1.56 and the peak about 89 kA. If a study result is far from such an estimate, look for a wrong uk, a wrong voltage or a missing source before trusting it. The short-circuit current calculator does this calculation with the correction factors.
IEC 60909, ANSI/IEEE C37 and OpenDSS are different methods
| IEC 60909 | ANSI/IEEE C37 (beta) | OpenDSS fault study | |
|---|---|---|---|
| Driving voltage | Voltage factor c on the nominal voltage | Prefault voltage, typically 1.0 p.u. | The solved network voltage |
| Machines | Correction factors on their impedance | Three networks: first cycle, interrupting, 30 cycles | As modelled in the circuit |
| Asymmetry | κ, ip, Ib | Multiplying factors from the X/R at the fault | Symmetrical, peak and thermal current per bus |
| Typical use | Europe and IEC-rated equipment | United States and Canada, ANSI-rated equipment | Distribution feeders, unbalanced networks |
The results of the three do not agree, and they are not supposed to. Compare numbers only within one method, and check a breaker against the standard it was rated to. More on the differences: pandapower and OpenDSS short circuit compared.
From an r.m.s. value to the current a breaker meets
The study returns r.m.s. values. A breaker meets a current with a DC offset that has not fully decayed when its contacts part. The picture at the top of this page is the Fault current waveform of a three-phase fault at a 110 kV bus: 18.2 kA r.m.s. gives a first peak of 47.3 kA, and 42 % DC component is left when the contacts part after 50 ms. Breakers are type-tested with a DC time constant of 45 ms. Where the network has a longer one, the window says so and the breaker needs a closer look.
The IEC 60909 study also reports these numbers itself, at every bus: the breaking current Ib (with the decay of generators and motors), the DC component and the asymmetrical breaking current at the contact parting time you set, and it checks each circuit breaker's making current, breaking current and DC component against its ratings (IEC 62271-100). See Breaking current and breaker check.
How to run it in Electrisim
- Make sure the diagram solves in a load flow, and that the External Grid has its maximum and minimum short-circuit power entered.
- Click Simulate → Short Circuit and choose the Pandapower or the OpenDSS tab. On the Pandapower tab, tick IEC 60909 or ANSI/IEEE C37.
- Choose the fault type, the maximum or minimum case, and all busbars or a selection.
- Run. The currents appear on the diagram at every faulted bus, line and transformer, and the Short-Circuit Dashboard opens with the highest fault levels and anything that needs attention.
- Read the breaking current, DC component and breaker checks on the dashboard, open Fault current waveform to see them in time, and export the PDF report or the Python code if you need them.
What to do with the result
- Breakers and switchgear: compare Ik″ or Ib with the breaking capacity, ip with the making capacity and Ith with the short-time withstand. With switch ratings entered, the duty check is done for you: making current, breaking current and DC component (IEC 62271-100) after an IEC 60909 run, interrupting and momentary duties after an ANSI run.
- Protection: use the minimum currents in the protection coordination study.
- Arc flash: the maximum three-phase result feeds the IEEE 1584 arc flash study.
- Wind and solar plants: converters contribute a limited current that depends on their control. See the 33 MW wind farm example.
Every diagram template can be used to try the study: app.electrisim.com.
Related: short circuit in the documentation, the cable fault current calculator, and the solver documentation of pandapower and OpenDSS.