Development History & Release Notes

Electrisim software versions curated from GitHub history, with the main changes in each release. Follow new releases via RSS

Software versions

Electrisim is continuously developed as open power-system analysis software powered by pandapower, OpenDSS, and ANDES. Releases follow Semantic Versioning (MAJOR.MINOR.PATCH): MINOR for new features, PATCH for fixes. The versions below are feature releases, aligned with work in the frontend and backend repositories. The date on each card is when that release shipped.

1.23.0 Voltage Stability Margin, Fault Current Waveform, Grid-Forming STATCOM Sizing & Time Series Playback November 2026
  • Voltage Stability Margin (P-V curves) (new, pandapower). Raises the load at one bus or across the network until the load flow no longer solves, and reports the three limits in the order they are met: voltage limit, first overload and voltage collapse. Compare buses ranks every bus by the load it can take. Play, Save image, Export video and CSV (docs)
  • Fault Current Waveform (new). One click on the Short-Circuit Dashboard shows the fault current in time for the three phases: first peak, DC component, and the DC share and asymmetrical current when the breaker contacts part, next to the 45 ms time constant of a standard breaker. Works with IEC 60909 and ANSI results (docs)
  • Grid-Forming STATCOM Sizing (Supercapacitors) (new, pandapower). Sizes the converter and the supercapacitor bank for synthetic inertia, phase jump, oscillation damping and frequency support, at end of life, with requirement sets that switch the duties on or off (docs)
  • Harmonic Analysis. The study can start from a controlled load flow (Park Controller, Plant Supervisory Controller, STATCOM, taps and reactor steps), so plants that only solve with their controllers now give results. Orders accept ranges such as 2-50. New frequency scan finds resonances at up to 6 buses. The results window is rebuilt with bus voltages, branch currents and a check against IEEE 519-2022 or IEC 61000-3-6 limits (docs)
  • Time Series Playback. Time-series results play on the diagram and export as video (docs). Failed time steps are reported instead of stopping the study
  • Solver Cross-Check. Compares the pandapower and OpenDSS results of the same network in one click (docs). OpenDSS line and transformer loading is now calculated the way pandapower does, switches are sent to the OpenDSS load flow, and OpenDSS matches pandapower on the transmission and CIGRE templates
  • Grid Code Compliance (P-Q and U-Q). New overload check and Line current 3D chart, both shown as soon as the results open. The U-Q results window is brought up to the P-Q one and honours the Park Controller as configured. Fixed U-Q and Local Q studies on plants with a STATCOM. Charts save at report and social-media sizes
  • Short circuit (IEC 60909). Line and transformer currents are reported per fault, with a Fault at column naming the bus behind each value; single-phase currents behind Dyn transformers and minimum-case branch currents are corrected. Single-phase faults get their real peak and thermal current. Fixed studies that failed on diagrams with a Motor, Generators, Static Generators or bus couplers. The Python export reproduces Electrisim's results, and the assumptions of the study are shown
  • ANSI short circuit. Each breaker's interrupting duty is checked at its own contact-parting time
  • Contingency Analysis. Base-case violations are marked, three-winding transformers are switched out and checked, and the dialog has a 50/60 Hz choice
  • Transient stability. Fixed faults at the External Grid bus, generator start-up drift and island networks. Results are plotted against real time
  • Protection Coordination. IDTOC relays with Manual time grading are evaluated on networks with transformers
  • BESS Preliminary Design. Two-winding skids can carry several PCS on one transformer
  • Load flow. HVDC elements are sent to the load flow, and load flows with an Impedance element are fixed
  • Studies answer with a plain message on a diagram with no buses or no source. Files open and save in Edge when its File editing permission is blocked. Fixes in Motor Starting, Optimal Power Flow, Eigenvalue Analysis, BESS Sizing, pandapower import and several templates
  • File → New template: the offshore template is renamed offshore wind farm and has a Grid Code P-Q/U-Q tutorial
1.22.0 Plant Supervisory Controller, STATCOM load flow & report-ready P-Q charts November 2026
  • Plant Supervisory Controller (new, pandapower). Leads STATCOMs and switched shunt reactors to hold Q, voltage, Q-V droop, cos φ or a Q(P) characteristic at a chosen bus such as the POC. The STATCOM keeps a reserve band while reactors take the bulk. Q(P) points can come from a Grid Code P-Q template, and the controller can be selected in Grid Code Compliance (P-Q)
  • STATCOM (SSC) load flow is solved as an equivalent voltage source, so it converges in networks with phase-shifting transformers. Q ratings are enforced (empty = no limit, 0 = none), Controllable off means idle, and the result box says whether Q is absorbed or supplied and when the STATCOM is at its rating
  • Grid Code Compliance (P-Q). Tap positions warm-start from the previous point, which fixes Q min divergence on large plants. The results open maximized, with inductive on the left and capacitive on the right. Element Q on the chart uses one sign convention, and the tooltip adds the grid-side Q. Copy image and Save image produce a report-quality chart with header, verdict and full legend
  • Voltage levels accept dot or comma decimals and comma, semicolon or space separators (e.g. 0,9; 0,95; 1,0). Values that cannot be read are rejected with a message, and an empty field uses the default levels. Fixed a P-Q run that could hang with several controllers
  • Sidebar Controls are a compact collapsible list. Study dialogs remember their last settings on the diagram
  • File → New template: offshore wind farm rev 7, with the STATCOM at 275 kV led by a Plant Supervisory Controller and a Park Controller for the turbines (also on the model page)
1.21.0 Grid Code P-Q trials, park controller & BESS dispatch-reversal fixes October 2026
  • Grid Code Compliance (P-Q). Trial power flows reuse one solved network per PCC voltage. Additional shunts can be ticked in or out of the study, and the results break Q at the PCC down by equipment
  • Park Controller. The Q search moves in bounded steps and stops at the machine Q limit instead of iterating on an unreachable target. Q can be measured at a busbar as the sum of the branch flows feeding it. Python exports include the controller, so the script runs standalone
  • BESS Dispatch Reversal. Study settings are saved on the Storage element, and P start and end default to the storage power. OpenDER fixes cover power-factor excitation while charging, response time, and the study rating. OpenDSS exports run standalone, and transformer currents are averaged over all phases
  • Result boxes on the diagram can be opened and closed, sit beside transformer symbols, stay clear of each other, and keep the position you move them to
  • Data Center Site Screening. N-1 contingencies report only violations the project adds, or makes worse by more than the tolerance, over the 0 MW baseline. Violations that already exist are not charged to the project
  • Wind turbines get default short-circuit currents. Three-winding transformers get a winding-order check, and load-flow warnings name the elements and buses involved
1.20.0 Fast Newton load flow on large networks October 2026
  • Large-network load flow (pandapower). Above 150 buses, eligible Newton-Raphson uses lightsim2grid (constant power, one slack, no FACTS, DC, or controllable shunts). The first Calculate builds the model and keeps it for a few minutes. The next Calculate on the same diagram sends only changed P, Q, and voltage setpoints and starts from the last voltages. The progress log says Updating setpoints on the saved model…. A topology edit, another algorithm, ZIP loads, a second slack, FACTS, DC, or a Python/results export builds the model again. See the load-flow documentation
  • From 200 buses, symbols are coloured and the numbers for the selected element appear in a card, instead of a result label on every bus and line. Load-flow requests are gzip-compressed
  • Power-flow animation and diagram colouring after a successful load flow
  • IEC converter short circuit: Ik"-based k factors and negative-sequence correction
  • Pandapower load flow is blocked on single-phase diagrams (those stay on OpenDSS). OpenDSS single-phase load flow uses the bus voltage directly
  • New diagram templates: CIGRE HV/MV/LV (including MV with PV, wind, and all DER), MV Oberrhein, Kerber and Dickert low-voltage networks, IEEE European LV; transmission cases including IEEE 118, PEGASE, RTE, and the GB network. IEEE 300 import and data-center site-screening result updates
  • University and academic licenses. BESS preliminary-design and 33 MW short-circuit tutorial scripts. Deploys revalidate Electrisim modules so an old browser cache does not hide a new version
1.19.0 Data center site screening, computational load ride-through & interconnection pocket September 2026
  • New study: Data Center Site Screening (Simulate menu) — MW sweep at one or more site loads, headroom search, N-1 and capped N-1-1 contingencies, voltage/thermal limits, comparison table with upgrade likely flag and CSV export; live progress overlay
  • Computational load on the Load dialog (IT vs cooling ZIP split, UPS hold-up, editable voltage ride-through curve) for data-center POI studies; ANDES transient stability compares POI RMS voltage to the curve and reports pass/fail in results (not PSS/E CMLD/PERC1)
  • New tutorial template: Data center interconnection (utility pocket) — 138 kV pocket with scalable load, backup gen, campus BESS, and ANSI-rated POI breaker for Phase 1 screening and Phase 2 interconnection workflows
  • ANSI/IEEE C37 short circuit: optional pre/post project comparison with per-bus duty table and CSV; fault location on selected busbars; diagram fault markers; corrections to duty and network handling
  • BESS Preliminary Design refinements — richer SLD result linking, corner-case and envelope presentation, tap-sweep and rating-check polish from post-1.18.0 BESS work
  • OpenDSS load flow, network health dashboard, and engineering-report updates; protection coordination and short-circuit fault-location options aligned with backend
1.18.0 BESS preliminary design, Grid Code (V-Q) & plant SLD wizard September 2026
  • New study: BESS Preliminary Design (Simulate → BESS Studies) — enter POC Pn and grid-code power factor (Q = Pn × tan(acos(PF))), generate the utility-scale HV plant SLD (Grid → POC → HV/MV transformer → MV collection → N× cable / string trafo / PCS inverter / DC bus / battery), then run named load-flow corner cases (Umin / Unom / Umax × export/import × capacitive/inductive, plus rated charge/discharge), rating checks, P/Q envelope at the POC, optional OLTC tap sweep; click a case or chart point to fill SLD result boxes; PDF summary. File → New template: Utility-scale BESS (HV POC)
  • New study: Grid Code Compliance (V-Q) — U-Q/Pmax at the PCC with plant P held at Pmax; red Qmax/Qmin versus the blue grid-code envelope (Q/Pmax × Pn); local Q or Park Controller constant Q at the PoC; pandapower; live progress and Stop. Distinct from Grid Code (P-Q) and from the older combined P-Q & U-Q study
  • BESS plant SLD: PCS inverter symbol, DC rack, optional three-winding MV skid (2 or 4 inverters per 690 V winding); Storage P–Q capability and OpenDER dispatch-reversal refinements from the post-1.17.0 BESS updates
  • Protection coordination results show whether each OCR is evaluated by pandapower or the Electrisim curve engine, plus attach notes
  • Storage Q-capability chart helpers on the Storage dialog; Map Editor basemap switched to Esri World Street Map (Carto tiles now require an API key)
1.17.0 BESS dispatch reversal (OpenDER), storage Q capability & busbar P/Q September 2026
  • New study: BESS Dispatch Reversal (Simulate menu) — charge→discharge P-step at the POC, co-simulating the IEEE 1547 inverter (EPRI OpenDER) with the OpenDSS network; V / P / Q vs time for FCR-style reversals (RMS screening, not a vendor EMT/PCS model)
  • Storage P–Q capability (Qmin/Qmax vs |P|) in pandapower and OpenDSS load flow, with capacitive/inductive max Q setpoints; the same envelope feeds OpenDER Q limits
  • On-diagram busbar result boxes: net P, Q, PF, and Q/P. Several BESS or generators on one bus are summed once (no double-count with branch flow)
  • External Grid min R0/X0 and X0/X for IEC 60909 single-phase minimum short-circuit; older diagrams reuse the max ratios if min is blank
  • Protection OCR: DTOC / IDMT / IDTOC TCC (IEC 60255 and IEEE C37.112), native pandapower trips plus Electrisim curve evaluation
  • Load flow warns with a confirm dialog when a transformer winding kV does not match the connected bus
1.16.0 ANSI/IEEE C37 short-circuit, Grid Code (P-Q) & live study progress September 2026
  • ANSI/IEEE C37 Short Circuit (beta) on the Pandapower tab: first-cycle (1/2-cycle), interrupting, and 30-cycle symmetrical duties with IEEE C37.010 / C37.13 / UL 489 / C37.013 multiplying factors; dedicated results dialog with per-bus currents and Switch duty pass/fail; currents written to diagram result boxes
  • Generator ANSI machine type and Switch interrupting / momentary ratings (Short Circuit tab) for equipment duty comparison on North American and Canadian projects
  • New study: Grid Code Compliance (P-Q) — P-Q envelope at the point of connection, separate from P-Q & U-Q; optional Park Controller plant-Q dispatch; independent two-winding / three-winding tap and shunt-reactor control; chart uses net P and Q at the PCC with grid-code overlay in p.u. of Pmax at the PoC
  • Simulation progress overlay across cloud studies — live log, expandable panel, Stop, and NDJSON streaming for long grid-code P-Q and RPC runs (load flow, OPF, short circuit, arc flash, protection, contingency, time series, and more)
1.15.0 Grid-code WTG, dual-solver shunt control & robust load flow August 2026
  • Grid Code Compliance (P-Q & U-Q) now selects Wind Turbine units as well as static generators; P-Q templates auto-pair the matching U-Q/Pmax envelope; U-Q template voltages are merged into the sweep so the U-Q chart is a curve
  • Pandapower load flow: automatic solver fallback (drop tap/shunt controllers, more iterations, flat start, Iwamoto) with an alert when the requested controller run cannot converge
  • OpenDSS snapshot load flow: same shunt characteristic table, discrete voltage control, and Line P→shunt step as pandapower; static generators / WTGs as constant-PQ (Generator Model=1)
  • Line-flow shunt control is gated with DiscreteShunt under Include controller → Shunt reactor tap changer (Park Controller stays independent)
  • File → New template: offshore wind farm 1 GW (rev 6); editor study modules load on demand for faster startup
1.14.0 Wind turbines, park control & OpenDSS studies August 2026
  • Dedicated Wind Turbine element: P(v) power curve (2.5 / 3.3 MW onshore and 15 MW offshore templates), voltage-dependent Q capability (P–U), and automatic P [MW] from wind speed in the element dialog and Component Data
  • Park Controller (pandapower) for plant Q, voltage, power factor, and tan(φ); cosφ(P) Overexcited (capacitive) / Underexcited (inductive) branches; Python export of park specs and WTG Q limits
  • Wind Turbine Controller (steady-state Pref from curve) and dynamic controller (averaging / gradient limiting)
  • OpenDSS: DG interconnection screening, Monte Carlo load flow, and RegControl / CapControl / StorageController
  • ANDES inverter-based resource / wind plant dynamics (REGCA1)
1.13.0 Arc flash, validation & grid code July 2026
  • Arc flash assessment (IEEE 1584-2018), with related study workflows and templates
  • Transient stability and eigenvalue analysis path via ANDES; motor starting / voltage dip studies
  • PowerFactory comparison and validation material
  • OpenDSS 75 Hz support
  • U-Q/Pmax grid-code compliance in reactive power capability (RPC) analysis
1.12.0 Single-phase & OpenDSS controls June 2026
  • Single-phase network elements in the editor and calculation path
  • BESS control support for OpenDSS
  • Power-flow direction visualization on buses
  • Protection coordination and short-circuit refinements
1.11.0 Studies & health dashboard May 2026
  • Protection coordination updates across multiple revisions
  • Contingency analysis and time-series simulation improvements
  • OPF cost and currency options in dialogs
  • Network Health Dashboard and load-flow feature enhancements
1.10.0 Controllers & editor polish April 2026
  • Discrete tap control and discrete shunt / reactor controllers
  • Transformer tap-control UI and load-flow controller grouping
  • Standardized electrical symbol sizing; map tile reliability (Carto CDN)
  • Engineering report / health-dashboard baseline compare; documentation links in dialogs
1.9.0 Economics, PQ, short-circuit & mobile March 2026
  • Economic analysis study tab
  • Reactive power capability (PQ diagrams), including regional grid-code profiles
  • Short-circuit and harmonics analysis improvements
  • Mobile UI work; three-winding transformer and static generator improvements
1.8.0 Harmonics, map & import February 2026
  • Harmonic analysis (voltage and current THD)
  • GIS map editor for geographic network layout
  • Native file import workflows
  • OpenDSS load-flow updates; revised offshore wind farm model; PDF export updates
1.7.0 OpenDSS short-circuit & DC January 2026
  • OpenDSS short-circuit / fault study
  • Production API host api.electrisim.com; OpenDSSDirect.py backend path
  • DC component improvements; BESS sizing
  • Registration and subscription status flow updates
1.6.0 DC elements & results December 2025
  • DC elements via pandapower
  • Results appearance and presentation updates
  • Backend pandapower 3.3.x pin and connection fixes
1.5.0 OpenDSS load flow & PV November 2025
  • OpenDSS load-flow integration in the cloud backend
  • PVSystem support
  • Railway deployment configuration and performance updates
1.4.0 OPF & operations studies July 2025
  • Optimal power flow (OPF)
  • Contingency analysis and time-series simulation
1.3.0 FACTS / SSC February 2025
  • SSC / STATCOM and related FACTS modelling path
  • Short-circuit and SSC bug fixes through early 2025
1.2.0 OpenDSS foundation May–June 2024
  • Early OpenDSS integration and load-flow path
  • Open-source repository readiness work
1.1.0 FACTS elements January 2024
  • SVC and TCSC elements added to the library
  • Runtime and dependency updates for cloud deployment
1.0.0 Platform launch March–July 2023
  • Backend API foundation and cloud hosting (Render / Heroku)
  • CORS and production API hardening
  • External-grid and multi-element result outputs — core cloud calculation platform

Source code: frontend and backend on GitHub. See also the documentation.

Coming next

Planned for the next releases. Requests from subscribers move items up the list: tell us what you need.

  • State estimation with pandapower's estimation module
  • OpenDSS dynamics mode and geomagnetically induced current (GIC) studies
  • Batch studies: parameter sweeps and many scenarios in one run
  • Custom models, including ANDES symbolic models
  • CIM/CGMES import and export for data exchange between TSOs and DSOs