Offshore wind farm model - 100 km export
We’re excited to present an offshore wind farm model with 450 MW rated power (30 × 15 MW turbines), with 100 km cable route length (between offshore and onshore substation). This model can be used to explore and adapt, thanks to open-source software at https://electrisim.com/ which you can use on a web-browser (no installation needed).
Key improvements in Rev 7 (02.11.2026)
- STATCOM (±200 Mvar) moved to the 275 kV busbar of the onshore substation.
- New Plant Supervisory Controller leads the STATCOM and the shunt reactors to follow a Q(P) characteristic at the 400 kV point of connection.
- Park Controller for the wind turbines, ready for the Grid Code Compliance (P-Q) study.
Key improvements in Rev 4 (16.04.2026)
- Replaced two-winding transformers with three-winding transformers at the onshore and offshore substations.
- Tap-changer controllers for transformers and shunt reactors implemented.
- Q–P characteristic curves added for wind turbine generators.
🔍 What’s special about this model?
- Fully customizable: Adjust parameters to suit your needs.
- Comprehensive analysis: Perform load flow and short-circuit calculations.
- Perfect for electrical/power system/T&D engineers or researchers.
💡Technical assumptions
- 15 MW wind turbines
- 2 offshore substations and 2 cable lines
- 66 kV inter-array cable network
- 275 kV cable lines
- 400 kV cable lines
- 400 kV – grid connection point in the Grid
- 66/275 kV offshore substations with three-winding transformers (with on-load tap changer) and fixed shunt reactors
- 275/400 kV onshore substation with three-winding transformers (with on-load tap changer), variable shunt reactors, STATCOM and harmonic filters (STATCOM on the 275 kV busbar).
- Park Controller (wind turbines) and Plant Supervisory Controller (STATCOM + shunt reactors)
Changelog
- 2026-11-02: rev 07 — STATCOM at 275 kV; Plant Supervisory Controller and Park Controller added (see “Key improvements” above)
- 2026-04-16: rev 04 — three-winding substation transformers; tap-changer control for transformers and shunt reactors; Q–P curves for wind turbine generators (see “Key improvements” above)
- 2026-02-09: rev 03 - new version published on 9th of February 2026 with comparable results within Pandapower and OpenDSS
- 2025-02-21: rev 1 - STATCOM and 400 kV cable added
- 2025-01-31: rev 0 - base model
Grid compliance tutorial: Step-by-step video and written guide — model walkthrough, equipment, load flow, and P-Q/Pmax verification at 400 kV (450 MW study) — 450 MW offshore wind — grid compliance tutorial. See also Grid Code Compliance (P-Q).