Simple example network: a first model for load flow and short circuit
This is the smallest useful network: a 110 kV grid connection, one transformer to 20 kV and a short feeder with generation and load. It contains one of each of the common elements, so it is the model to start with if you have not used Electrisim or pandapower before. It follows the simple example network of pandapower.
What is in the model
| Element | In the model |
|---|---|
| Voltage levels | 110 kV and 20 kV |
| External grid | One, at 110 kV: the slack bus |
| Transformer | One, 110/20 kV |
| Lines | Four, 18 km in total |
| Generation | One synchronous generator and one static generator |
| Load | One load, and one shunt for reactive power |
What to try with it
- Load flow. Run it and read the voltage at each bus and the loading of the transformer. Then switch the generator off and see the voltage at the end of the feeder fall. The load flow guide explains the bus types this model uses.
- Short circuit. Run a three-phase IEC 60909 fault on all buses. The fault level drops sharply across the transformer and again along the lines. See the short circuit guide.
- Both engines. Solve the same model with pandapower and with OpenDSS and compare the results with the solver cross-check.
Download the file, then open it in the Electrisim app with File → Import from → Device. The editor can be used without an account; running a study in the cloud needs a subscription.
Related: the multi-voltage example as the next step, and the per-unit calculator for checking a result by hand.