33 MW onshore wind farm model with a 50 km 110 kV cable and a shunt reactor
This model was built for a question that comes up on almost every wind farm with a long cable connection: how much reactive power compensation is needed so the plant meets the grid code at the point of connection. A 50 km 110 kV underground cable produces a lot of capacitive reactive power, much more than an overhead line of the same length, and that has to be absorbed somewhere. Here it is absorbed by a variable shunt reactor working together with the turbines.
What is in the model
| Element | In the model |
|---|---|
| Rated power | 33 MW: ten turbines of 3.3 MW, modelled as static generators |
| Voltage levels | 0.69 kV at the turbines, 30 kV collector network, 110 kV export |
| Transformers | 11: one 0.69/30 kV transformer per turbine and the 110/30 kV substation transformer |
| Cables | 11 sections, 74 km in total, of which 50 km is the 110 kV export cable |
| Buses | 23 |
| Reactive power compensation | One variable shunt reactor on the 110 kV side of the 110/30 kV substation |
| Point of connection | The 110 kV switchgear in the grid operator’s substation, where the external grid is connected |
The reactor sits in the wind farm substation rather than at the point of connection, because the point of connection is on the grid operator’s property. So the reactor works at one end of 50 km of cable while the grid code is checked at the other, which is what makes the sizing interesting.
What to try with it
- Load flow at zero output. Set the turbines to 0 MW and read the reactive power at the point of connection. This is the cable charging the reactor has to cancel, and it is there day and night.
- Load flow at full output. Run 33 MW with the turbines at their reactive power limits in both directions and check whether the plant reaches the reactive power range the grid code asks for at the point of connection.
- Size the reactor. Change the reactor rating until both cases above are inside the required range. The reactive power compensation guide walks through this model step by step.
- Grid code compliance. Run the P-Q and U-Q checks for the point of connection. See the grid code compliance guide.
- Short circuit. Calculate the fault levels at 110 kV and 30 kV with IEC 60909, and compare pandapower with OpenDSS. See the 33 MW short circuit walkthrough.
Download the file, then open it in the Electrisim app with File → Import from → Device. The editor can be used without an account; running a study in the cloud needs a subscription.
The model was first described in a LinkedIn article.
Changelog
- 2026-03-18: rev 1, published
Related: the offshore wind farm model, the 100 MW solar farm model and grid-forming STATCOM sizing.