Sizing a grid-forming STATCOM: converter rating and supercapacitor bank

A STATCOM exchanges reactive power with the grid. It has a small DC capacitor and no energy store worth the name, so it cannot deliver active power for more than a few milliseconds. Newer connection conditions for wind and solar plants ask for more: the STATCOM should behave as a voltage source, provide synthetic inertia and damp power oscillations. All of these need active power for seconds. The usual answer is a bank of supercapacitors on the DC side.

Two sizing questions follow. How much active power and energy do the grid-forming duties need? And which converter rating and supercapacitor bank deliver them at the end of the bank’s life? This guide goes through both, with the formulas, and shows how the study in Electrisim answers them from a plant model.

The four duties and the active power they need

DutyWhat you specifyActive power
Synthetic inertiaInertia constant H in seconds, on the plant rated power or on the STATCOM ratingP = 2·H·S·(f/f0)·(df/dt)/f0, against the change of frequency
Voltage source behaviour (phase jump)Phase jump in degrees and a decay time constantP = V2·sin(Δθ) / (Xcoupling + Xgrid), decaying
Power oscillation dampingAmplitude in percent of the STATCOM rating, and the oscillation frequencyA sine wave of that amplitude
Frequency support in an islandDroop, deadband, largest power and a bridging timeThe droop response, held until the turbines have taken over

Only duties that need active power call for supercapacitors. If the connection conditions ask for no grid forming, the result of the study is that no bank is needed.

A hand calculation for synthetic inertia

The numbers below are a worked example by hand, to show the orders of magnitude. They are not the output of the study.

A 100 MVA plant has to provide an inertia constant of H = 4 s, and the frequency falls at 1 Hz/s in a 50 Hz system. Near rated frequency the power is

P = 2 · 4 s · 100 MVA · (1 Hz/s) / 50 Hz = 16 MW

If the frequency keeps falling for 1.5 s, from 49.0 to 47.5 Hz, the energy is about 16 MW × 1.5 s = 24 MJ, which is 6.7 kWh. The energy is small and the power is large. That combination is what supercapacitors are good at and what makes a battery a poor fit.

From energy to a number of cells

A supercapacitor stores E = ½·C·V2. A common 3000 F cell at 2.7 V holds 10.9 kJ. The bank cannot be emptied, because the converter needs a minimum DC voltage. Discharging to half the voltage uses three quarters of the energy, 8.2 kJ per cell. The 24 MJ of the example then need about 2900 cells.

That is before the corrections that decide the real size:

  • End of life. Capacitance falls and series resistance rises as the cells age. With 80 % of the capacitance left, the same energy needs about 3700 cells.
  • Cell current. At the lowest voltage the current for a given power is highest. The peak current of the cell often sets the number of parallel strings, not the energy.
  • Voltage drop. The series resistance lowers the terminal voltage during discharge, so the minimum voltage is reached earlier than the energy alone suggests.
  • Converter efficiency and a design margin.
  • Charging. When the frequency rises the bank has to absorb energy, so it cannot rest at its highest voltage.

The duties also overlap. A phase jump and an inertial response can arrive in the same event, so their powers add. This is where a hand calculation stops being practical.

The converter has to carry both

The active power of the duties comes on top of the reactive power the STATCOM delivers for voltage control. The converter must be rated for both, with the short-time current capability it has for the event. A STATCOM that already runs near its rating for reactive power has little room left, and the study reports the converter rating that would be needed.

What the Electrisim study does

The study reads the STATCOM rating, its coupling reactance and the plant rated power from the diagram. It takes the reactive power of the STATCOM from a load flow with the plant controllers active, and calculates the short-circuit power of the grid at the STATCOM bus and at the connection point with the turbines out of service, so the phase-jump power is based on the grid alone. It then simulates the bank through a falling and a rising frequency event with end-of-life capacitance and resistance, and returns the smallest number of parallel strings that keeps the bank voltage and the cell current inside their limits.

The results list the peak power and energy of each duty and of all together, the cells in series and strings in parallel, the usable energy, the lowest and highest bank voltage in the events, the peak current per cell, and the short-circuit ratios of the STATCOM and of the plant.

How to run it

  1. Model the plant with its STATCOM, and confirm that a load flow converges with the controllers you use.
  2. Click Simulate → Grid-Forming STATCOM Sizing (Supercapacitors).
  3. Pick the STATCOM and the connection point bus, and check the ratings.
  4. Choose a requirement set or Custom, and set every duty value.
  5. Enter the data sheet values of the cell you plan to use, and click Calculate.

Agree the duty values first

Connection conditions usually leave the numbers to be agreed with the grid operator: the inertia constant, the rate of change of frequency, the phase jump and the damping power. The values a requirement set fills in are starting assumptions. The size of the bank follows them almost in proportion, so replace them with the agreed values before you use the result.

Limits of the study

This is a sizing study with prescribed power profiles. It is not a dynamic simulation of the converter control, and it does not prove stability or tune a controller. The thermal design of the bank, cell balancing and the DC/DC stage are outside its scope. It gives a first size to take to suppliers.

The study needs a diagram with a STATCOM and a load flow that converges. Open the app at app.electrisim.com.

Related: grid-forming STATCOM sizing in the documentation, the grid code compliance study for the reactive power side, and transient stability with ANDES for dynamic simulation.

Try Electrisim Personal for $10 per month

Run pandapower, OpenDSS & ANDES studies (load flow, short-circuit, OPF, harmonics, dynamics) in your browser — cancel anytime, no setup fees.

Subscribe Secure via Stripe · 1-click cancel