Getting Started with Electrisim
Learn the basics of using Electrisim for power system analysis. This tutorial covers the essential features and how to create your first power system model.
Short videos and written walkthroughs that show the whole workflow: build the network, run the study, read the results. Follow along in the free browser editor.
Three steps from zero to your first result.
The essential features and how to create your first power system model.
Watch “Getting started” →Build a simple network, run load flow and read bus voltages and line loading.
Watch “First circuit” →Open the editor free, no signup. Subscribe from $10/month when you are ready to run simulations.
Press play to watch here, or open the video on YouTube.
Learn the basics of using Electrisim for power system analysis. This tutorial covers the essential features and how to create your first power system model.
Step-by-step: build a simple network in the diagram editor, run a load-flow study, and interpret bus voltages and line loading in Electrisim.
Import a pandapower script (.py) or an OpenDSS circuit (.dss) and Electrisim builds the single-line diagram for you, with a vertical or horizontal layout. No redrawing the network by hand. In the app: File → Import from → Device...
P-Q envelope at the point of connection: net P and Q at the PCC, optional Park Controller, and a grid-code overlay in p.u. of Pmax at the PoC. In the app: Simulate → Grid Code Compliance (P-Q). Documentation.
Check a plant at the point of connection in both planes: the P-Q envelope and the U-Q/Pmax capability, with local or Park Controller reactive power dispatch. In the app: Simulate → Grid Code Compliance (P-Q & U-Q). Documentation.
Walkthrough of the 33 MW onshore wind farm model in open-source Electrisim: WTG PQ capability, park controller with power-factor control at the 110 kV POC, load flow at U = 1.1 pu, and adding an 11th turbine to the controller list. Template: File → New → onshore wind farm 33MW.
Walkthrough of the offshore wind model: reactive power & voltage control equipment (WTGs, OLTC, VSR, STATCOM), baseline load flow, then Polish NC RfG P-Q/Pmax verification at 400 kV. Builds on the Grid Code (P-Q) tutorial.
Walkthrough: enabling DiscreteTapControl on transformers, using Include controller in the Pandapower load-flow dialog, and reading resulting tap positions on the diagram and in exports.
See how to model and operate shunt reactor tap control in Electrisim—useful when you need discrete steps on reactive compensation equipment as part of your load-flow setup.
Walk through N-1 contingency screening in Electrisim: take lines, transformers, or generators out of service one at a time, run AC power flow for each case, and review thermal and voltage violations in the results dialog.
Learn how to run optimal power flow in Electrisim with pandapower: set up generation costs, open Simulate → Optimal Power Flow (runopp), and interpret dispatch and constraint results on the diagram.
Run hour-by-hour AC load flow with time-varying load and generation profiles. Open the built-in tutorial network (New Diagram → Tutorials → Time Series Simulation), define profiles per element, simulate 24 hours, and review charts, statistics, and Excel export. See also the time series documentation.
Walkthrough of Simulate → BESS Studies → BESS Preliminary Design: enter POC active power and grid-code power factor, auto-size PCS and transformers, generate the HV-connected plant SLD, optional HV cable or MV POC layout, then run named load-flow corner cases, rating checks, and the P/Q capability envelope at the POC. Template: File → New → Utility-scale BESS (HV POC). See documentation.
See how a battery energy storage system (BESS) exporting power on a weak grid can push POC voltage above limits, and compare mitigation with OpenDSS inverter controls—fixed Q, fixed power factor, and Q-V droop. Open the built-in tutorial network (New Diagram → Tutorials → BESS Overvoltage in Weak Grids) or import the OpenDSS template, run five scenarios, and review results with Scenario Compare.
Compare Electrisim load-flow results with DIgSILENT PowerFactory on four transmission test models—grid/line/load, two-winding transformer, three-winding transformer, and static generators (export). Open the built-in template (File → New → Testing with other software → Comparing PowerFactory), run load flow on each tab, and validate pandapower against PowerFactory.
Walkthrough of grid-code P–Q compliance on the 33 MW onshore wind farm template: open File → New → onshore wind farm 33MW, set the POC sweep with the park controller at 110 kV, run Simulate → Grid Code Compliance (P–Q), and compare the plant capability envelope (red) with code requirements (blue). See non-compliance at rated voltage, then enable transformer tap-changer control and re-run to reach compliance. Builds on Grid Code (P-Q) and Onshore wind grid compliance.
A walkthrough of short-circuit analysis in Electrisim on the onshore wind farm model. The written guide explains the IEC 60909 and OpenDSS methods behind the results.
IEC 60909 and OpenDSS fault studies on the same 33 MW template: three-phase and single-phase duties, ikss / ip / ith, phase conductors versus cable screens, and how transformer vector group steers earth-fault current. Template: File → New → onshore wind farm 33MW, then Simulate → Short Circuit.
No tutorials match that search.
Try a shorter term, search the documentation, or ask us to record it.
Two pages of formulas and tables for short circuit, transformers, cable sizing, voltage drop, power factor, harmonics and arc flash, plus practical tips and Electrisim updates by email.