Italian Hypergrid model: a 10-bus 380 kV transmission network with HVDC VSC links
This model reduces the Italian transmission system to ten 380 kV nodes and the lines between them, plus one node for the rest of Europe. It is small enough to understand in an afternoon and still shows the main feature of the Italian grid: a long north–south corridor that limits how much power can move from the generation in the south to the load in the north.
It was built by Antonino Patti in his thesis at the University of Palermo. The thesis first checked the 10-bus model against the same network in NEPLAN, and then added the HVDC links of the Hypergrid project from the Terna 2023 Development Plan, using the DC elements of pandapower. The article on the model and the thesis describes the work in more detail.
What is in the model
The template has two pages. The first is the AC network on its own, with results, as it was compared with NEPLAN. The second adds the HVDC links.
| Element | AC model | With HVDC |
|---|---|---|
| Voltage level | 380 kV | 380 kV AC, 500 kV DC |
| AC nodes | 10 Italian nodes and one node for the rest of Europe | The same, with a bus at each converter station |
| AC lines | 15, about 330 km in total (one is out of service) | The same, with short connections to the converter stations |
| Generators | 10: nine Italian plants and one European equivalent | The same |
| Loads | 11 | The same |
| External grid | One, the slack | The same |
| HVDC | – | Six VSC converter stations (Avenza, Montalto di Castro, Latina, Montecorvino, Rossano and Priolo), six DC buses and three DC lines |
What to try with it
- Load flow without and with HVDC. Run the first page, note the loading of the north–south lines, then run the second page. The difference is the power the HVDC links take off the AC corridor. The load flow guide explains how to read the results.
- Converter set points. Change the active power of the VSC stations and run again. You can see how far the HVDC links can relieve the AC lines before they shift the problem to another one.
- N-1 contingency on the AC network. Take the 380 kV lines out one at a time and find the outage that overloads the corridor. Then repeat with the HVDC links in service. See the N-1 guide.
- Compare with another tool. The AC page is the case that was checked against NEPLAN, so it is a good test of your own model in another program. See the validation study.
The data is simplified: one node stands for a whole region, so the model is for learning and for first estimates of transfer, not for detailed planning.
To open it, go to the Electrisim app, choose New diagram, open the Transmission tab and pick 10-bus Italian grid. The editor can be used without an account; running a study in the cloud needs a subscription.
Thanks to Antonino Patti for the model, and to the pandapower developers for the DC elements that made the HVDC part possible.