100 MW solar farm model: 288 inverters, 30 kV collector network, 110 kV connection

This is a full single-line model of a 100 MW photovoltaic plant, down to the individual inverter. It is large enough to show the effects that matter in a real plant: the voltage rise along the low-voltage cables, the losses in the collector network and the reactive power the plant can deliver at its grid connection.

Single-line diagram of the 100 MW solar farm model in Electrisim

What is in the model

ElementIn the model
Rated power100 MW
Inverters288, modelled as PVSystem elements at 0.8 kV
Voltage levels0.8 kV at the inverters, 30 kV collector network, 110 kV grid connection
Transformers17: the inverter transformers to 30 kV and the main 110/30 kV transformer
Cables307 sections, about 63 km in total
Buses323
Reactive power compensationOne shunt reactor
External gridOne, at 110 kV

The inverters are PVSystem elements, which are solved with OpenDSS. Choose the OpenDSS tab in the Load Flow dialog.

What to try with it

  • Load flow at full output. Read the losses between the inverters and the grid connection, and the voltage at the inverters furthest from the transformer.
  • Daily profile. Run the OpenDSS load flow in daily mode with an irradiance profile and see how the reactive power at the grid connection changes between night, when only the cables are generating, and midday.
  • Harmonics. Give the inverters a current spectrum and check the voltage distortion at 30 kV and 110 kV, and the resonance the cable network forms. See the harmonics guide.
  • Short circuit. Run the OpenDSS fault study for the fault levels in the collector network.

All parameters can be edited: change the cable types, the transformer ratings or the number of strings and run the studies again.

Download the file, then open it in the Electrisim app with File → Import from → Device. The editor can be used without an account; running a study in the cloud needs a subscription.

Changelog

  • 2025-11-18: rev 0, base model

Related: the grid code compliance guide, the BESS preliminary design guide for adding storage, and the onshore wind farm model.

Open this model in Electrisim

Load the file in the free browser editor, then subscribe to run load flow, short circuit, harmonics and dynamics from $10 per month. Cancel anytime.

Subscribe or try the editor free →